Palm Beach International Airport Public Address System Replacement

Location:
Palm Beach, FL

Services Provided:
Construction Management

A² provided construction management services for Replacement of the Public Address System at the Palm Beach International Airport. The scope of this project included replacement of the Public Address System with new hardware, software, amplifiers, speakers, paging microphone stations noise sensors and associated cabling; demolition of the existing Public Address system includes, deprogramming and carefully removing old system components and devices.


GOAA Continuing Project and Program Management Service Contract

Location:
Orlando, FL

Services Provided:
Program and Construction Management

A² has a Continuing Program and Project Management Services Contract with the Greater Orlando Aviation Authority (GOAA), which includes the Orlando International Airport and the Orlando Executive Airport. We provide all services necessary for the management of the design and construction of both individual projects and programs.


United Airlines Cargo Facility

Location:
Miami, FL

Services Provided:
Construction Management

A² provided construction management services for the construction of a cargo building facility at the Miami International Airport. The building is designed to house approximately 95,000 square feet of cargo area and approximately 12,500 square feet of cargo operations offices including conference and training facilities.


Taxiway Alpha 3 at the Naval Air Station

Location:
Jacksonville, FL

Services Provided:
Design & Build Services

A² was contracted by NAVFAV Southeast to provide design-build services for the repairs to Taxiway Alphas A/3 at the Naval Air Station located at Jacksonville, FL. The work entailed geotechnical exploration, design and construction to repair Taxiway A/3 pavement (3,000 SY) and drainage in accordance with Unified Facilities Criteria, Airfield and Heliport Planning and Design, and Pavement Design for Airfields and Surface Drainage Facilities for Airfields and Heliports. A²’s design was based on new airfield loadings anticipated for the NAS JAX mission (737 MMA, C17, C5, C40, etc) over the next ten years. This project was conducted in an active secure airport facility, on airside, which required continual coordination with airfield operation to avoid disruption to their daily work schedule. Work was performed during both daytime and nighttime. This project was completed two weeks ahead of schedule..


Snapper Creek Marina

Location:
Coral Gables, FL

Services Provided:
Infrastructure Improvements

The Snapper Creek Marina is a full service marina, which is located on two acres with thirty-eight slips/moorings and the capacity for thirty-five dry storage spaces.  The project consisted of the upland improvements to the marina infrastructure and surface pavements.  For the infrastructure changes, the focus was on new private fire mains, fire hose Siamese connections, fire safety cabinets, water mains and electrical services for the entire marina.  Throughout the marina, the improvements will provide waterproof lighted pedestals with house electrical receptacles, shore power, and potable water services.  Topographical enhancements were designed to help with drainage as well as vehicular, vessel and pedestrian positioning and limits.  Other improvements included the surface pavement treatments (asphalt, striping, and pervious concrete for an innovative drainage technique) and site improvements (site lighting, fencing, screening, security, and landscaping). 

Port of Miami Seaport Redevelopment

Location:
Miami, Florida

Services Provided:
Pre-construction, Project Controls, Scheduling, Claims Avoidance

A² Group, Inc. provided construction management services for the Haskell Group at the Miami Seaport Redevelopment Project, which encompassed both the cruise and cargo zones. The scope of work included programming, design and rehabilitation of cruise terminals and support infrastructure, and ancillary services. This project used fast-track programming, multiple phases and other methods to achieve this complex program. The services required overall coordination services during planning, permitting and construction phases.


MIA South Terminal Expansion

Location:
Miami, Florida

Services Provided:
Construction Management, Scheduling, Cost Management, Quantity Surveying, Estimating

The South Terminal Program was a major expansion to the former terminal configuration and consisted of eight major projects, including the MIA South Terminal Expansion, MIA Terminal South/Terminal Improvements, Concourse J, H-J Utility and Pavement Project, Concourse H modifications for International Gates, Concourse H International Head house Demolition and Construction, and MIA H Terminal Improvements and H-J Sewer and Related Work. A² provided construction management services including scheduling, cost management, quantity surveying and estimating.